301_1

Community Development

Request For Inspections

24 hour notice is required after work is completed and ready for inspection. Permit Number required when inspection is scheduled.

Request Online

How to Login

If you have applied as a contractor (builder): Example:
Username: your permit number
Password: first 5 characters of the builder’s name + the permit number (no spaces)
XYZ Contracting with permit number 5656
Username: 5656
Password: xyzco5656
If you have applied as an owner builder: Example:
Username: your permit number
Password: first 5 characters of your last name + your permit number (no spaces)
John Bentley with permit number 6565
Username: 6565
Password: bentl6565

County Policy

A 4 yard capacity dumpster with lid or cover must be located at the building site during all phases of construction. Said dumpster shall be serviced on a regular basis to avoid overloading.

A sanitary facility “porta-pottie” device, shall be required at each construction site in Washington County. Said facility shall be maintained at the site until the construction is completed or until alternative facilities, through construction, can be made available.