Third Falls Pool, Gould Wash, Hurricane, Utah

Gould Wash Final Plan-EIS NOA Update

View/Download the Flyer for further details

The United States Department of Agriculture Natural Resources Conservation Service (NRCS), Washington County, and Hurricane City announce the availability of the Warner Draw Watershed Supplemental Watershed Plan No. 10 and Final Environmental Impact Statement (Plan-EIS) for the Gould Wash Flood Protection Project (Project). The Project preferred alternative proposes improvements along Gould Wash through Hurricane City and installation of a dry detention dam on land managed by the Bureau of Land Management upstream of Hurricane City, in Washington County, Utah. The Project would reduce flooding in Hurricane City, protecting people, structures, transportation infrastructure, public utilities, and property from floodwater damage.

View/Download the Flyer for further details

Dixie Convention Center

RFP for Dixie Center Garden Room Architectural Backdrop Wall, Ballroom Airwall Recovering, and Auditorium Carpet Replace

The intent of these Request for Proposals (RFPs) are to each select a contractor for the following Dixie Center projects:

To receive consideration, responses to these RFPs must be received no later than 4:00 pm MST on April 21, 2026. Electronic and hard copy proposals are each acceptable.

Attention: Jared Stephenson, Director
Subject: [Add title of RFP to note which contract you are submitting for]
Dixie Convention Center (DCC)
1835 Convention Center Drive
St. George, UT 84790
(Google Maps)
jareds@dixiecenter.com
(435) 301-7788

Prior to the submission deadline, Washington County may amend or clarify the RFP in the case of any discrepancies or omissions. Any change will be posted as a formal written addendum on the Washington County website. In the event of a revision to the RFP after the closing date, candidates will have an opportunity to refine, submit or resubmit their proposals.

Contractors will be selected with required Commission approval after April 21, 2026. Actual start of work to be scheduled around the DCC’s event calendar.

Questions or comments concerning this RFP must be submitted to the point of contact no later than the proposal due date as indicated in the procurement schedule.