Third Falls Pool, Gould Wash, Hurricane, Utah

Gould Wash Final Plan-EIS NOA Update

View/Download the Flyer for further details

The United States Department of Agriculture Natural Resources Conservation Service (NRCS), Washington County, and Hurricane City announce the availability of the Warner Draw Watershed Supplemental Watershed Plan No. 10 and Final Environmental Impact Statement (Plan-EIS) for the Gould Wash Flood Protection Project (Project). The Project preferred alternative proposes improvements along Gould Wash through Hurricane City and installation of a dry detention dam on land managed by the Bureau of Land Management upstream of Hurricane City, in Washington County, Utah. The Project would reduce flooding in Hurricane City, protecting people, structures, transportation infrastructure, public utilities, and property from floodwater damage.

View/Download the Flyer for further details

United States Department of Agriculture logo

Warner Draw Watershed Supplemental Plan & Environmental Impact Statement for the Gould Wash Flood Protection Project

The United States Department of Agriculture, Natural Resources Conservation Service (NRCS), Washington County, and Hurricane City announce the availability of the Warner Draw Watershed Supplemental Watershed Plan No. 10 and Draft Environmental Impact Statement (Plan-EIS) for the Gould Wash Flood Protection Project (Project). The Project preferred alternative proposes improvements along Gould Wash through Hurricane City and installation of a dry detention dam on land managed by the Bureau of Land Management upstream of Hurricane City, in Washington County, Utah. The Project would reduce flooding in Hurricane City, protecting people, structures, transportation infrastructure, public utilities, and property from floodwater damage.

An evaluation of potential project alternatives and associated environmental impacts have been documented in the form of a Draft Plan-EIS. NRCS (lead federal agency) and the local sponsoring organizations (Washington County and Hurricane City), will hold a public meeting to provide information about the proposed Project and Draft Plan-EIS analysis, and to collect comments on the Draft Plan-EIS.

Draft Plan-EIS Public Meeting

You are invited to attend, discuss, and submit a comment during the Draft Plan-EIS meeting:

When:
October 22, 2025 (Wednesday), 6:00 PM to 7:30 PM
Where:
Hurricane Community Center Bryce Canyon Room
63 South 100 West
Hurricane, UT 84737
(Google Maps)
Join the Meeting Virtually at:
https://tinyurl.com/DraftPlan-EISMeeting

How to Submit a Comment

All comments should be directed to Anders Fillerup:

Utah State NRCS Office
Address: 125 South State Street,
Room 6416,
Salt Lake City, UT 84138-1100
Phone: (385) 245-7709
Email: anders.fillerup@usda.gov

Comments may be mailed or emailed to the above address or submitted during the Draft Plan-EIS meeting. Comments must be received by November 6, 2025, to become part of the public record.

How to Obtain Draft Plan-EIS

An electronic copy of the Draft Plan-EIS can be downloaded from the NRCS Project website here:

https://www.nrcs.usda.gov/publications/gould-wash-draft-plan-eis-noa-flyer.pdf

Other project documents can be access here:

https://www.nrcs.usda.gov/conservation-basics/natural-resource-concerns/watersheds/gould-wash-flood-protection-sponsor

A hard copy of the Draft Plan-EIS is available for review at the Hurricane Branch Library (Google Maps) and Hurricane City Office (Google Maps).

United States Department of Agriculture logo

Santa Clara Watershed Plan EA Project

Notice of Availability & Public Meeting

Download Santa Clara Watershed Plan EA Project Fact Sheet

The United States Department of Agriculture’s Natural Resources Conservation Service (USDA-NRCS), with assistance of Washington County, Utah, as the project sponsor, is considering proposed improvements within the Santa Clara Watershed. The proposed improvements include the construction of stream diversions and detention basins within the Dammeron and Diamond Valleys as well as other improvements within the Shivwits Band of Paiutes lands, including stream restoration, irrigation supply, and flood protection.

Washington County & USDA-NRCS will hold an in-person public meeting to provide information about the proposed project and to collect comments. Technical studies have concluded, and the Draft Plan-Environmental Assessment (EA) is now available for public comment. Download the fact sheet for full details.

Download Santa Clara Watershed Plan EA Project Fact Sheet

Washington County of Utah

Notice of Bid — SR-18; Veyo to Central Multi-Use Path Project

NOTICE OF BID INVITATION
Washington County
SR-18; Veyo to Central Multi-Use Path Project

Sealed bids will be received for the construction of the SR-18; Veyo to Central Multi-Use Path Project. Bids must be submitted by November 29, 2023, 10:00 AM, to Washington County, c/o Todd Edwards, at the Washington County Public Works Department located in the Washington County Office Building, Commission Chambers, 111 East Tabernacle, St. George, Utah 84770 (Google Maps). Bids will be opened publicly and read aloud. Each Bid must be submitted in a sealed envelope, addressed to Washington County, c/o Todd Edwards, 111 East Tabernacle, St. George, Utah 84770. Each sealed envelope containing a Bid must be plainly marked on the outside "SR-18; Veyo To Central Multi-Use Path Project".

There will be a non-mandatory pre-BID meeting and site visit 111 East Tabernacle, St. George in Training conference room #301 on Monday, November 20, 2023 at 10:00 AM.

The Bid includes furnishing all labor, materials, transportation, and services to construct approximately 6 miles of paved bike/multi-use path, including drainage improvements, and other miscellaneous items.

All bidders who submit a bid are required to be on the Plan Holders List. Addenda will only be provided to the plan holders that are on the Plan Holders List.

To view and obtain bidding documents go to:
https://tinyurl.com/4j3ju4sf

To be added to the Plan Holders List go to:
https://tinyurl.com/k2uc9um8

If either of the links do not work, email kroberts@mainline-eng.com

Technical questions regarding the Bidding Documents shall be directed to Kayde Roberts, (435) 668-6324, kroberts@mainline-eng.com.

A 100% performance — labor and materials bond will be required on this project. Every Bid shall be accompanied by a bid bond in the amount of 5% of the bid, naming Washington County as oblige, this bid bond must be issued by a surety company licensed to do business in the State of Utah and be on a bond form acceptable to Washington County.

Washington County reserves the right to reject any, or all bids, or to waive any formality or technicality in any bid, in the interest of the County.

Washington County of Utah

Transportation Master Plan Meeting Today

Washington County is working to update its Transportation Master Plan and Active Transportation Plan

Join us for a public meeting in St. George Library. Interactive displays will be set up to get input from residents.

Wednesday, May 24, 2023
4:00 PM – 7:00 PM

St. George Library
88 W 100 S
St. George, UT 84770
(Google Maps)

For more information:
www.washcoplan.com
435-862-9216

Download flyer for distribution

Snow Canyon Overlook

SR-18 Road Construction Project Info

Road Construction Project
SR-18 Widening

Washington County is working in conjunction with Utah Department of Transportation (UDOT) to add approximately eighteen feet (18′) of additional pavement to Northbound SR-18 from The Ledges to the North Snow Canyon entrance. This project will begin on Monday, February 14, 2022. Completion is expected no later than Sunday, May 01, 2022. Please be aware of construction vehicles during this time.

SR-18 Road Construction Project Info – The Ledges to North Snow Canyon

Snow Canyon Overlook

Notice of Bid — SR-18, Ledges to North Snow Canyon, Northbound Widening

NOTICE OF BID INVITATION
Washington County
SR-18, Ledges to North Snow Canyon, Northbound Widening

Washington County will receive sealed proposals until 10:00 am local time, Friday, January 28, 2022, at the Washington County Commission Office for
the following project:

Visit Public Works to download Bid Documents

This project consists of roadway construction which includes widening SR-18 with approximately 18 feet of additional pavement in the Northbound direction from The Ledges to the North Snow Canyon entrance. Roadway excavation, drainage, traffic control, and other related items included. Construction period will be from date Notice To Proceed is issued to May 1, 2022. This project may be awarded at the discretion of the Owner.

Bids will be opened publicly at 10:05 am local time, Friday, January 28, 2022, at:

Washington County Commission Chambers
Administration Building
111 East Tabernacle 
St. George, UT  84770
(Google Maps)

Bid documents may be obtained from Washington County Public Works Department. Please contact Washington County Public Works Deptartment at 435-301-7670 to reserve a printed set of plans and specifications and to get your name on a list for any notifications of bid addenda or clarifications.

Visit Public Works to download Bid Documents

Confluence Park hydroelectric power plant

Bid for Confluence Park Field Leveling and Irrigation Project

NOTICE OF BID INVITATION
Washington County
Confluence Park Field Leveling and Irrigation Project

Washington County will receive sealed proposals until 10:00 a.m. local time, Wednesday, March 25, 2020 at the Washington County Commission Office, for Confluence Park Field Leveling and Irrigation.

Visit Public Works to download Bid Documents

This project consists of construction of approx. 32.25 acres of land leveling, 2,920 LF of 8” diameter PVC pipe, 1,960 LF of 6” diameter PVC pipe, 12 6” gate valves, and 12 concrete irrigation outlet boxes may be awarded at the discretion of the Owner.

Bids will be opened publicly at 10:05 a.m., March 25, 2020, at the Washington County Commission Chambers, Administration Building:

111 East Tabernacle
St. George, UT 84770
(Google Maps)

Bid documents may be obtained from Washington County Public Works Department. Please contact Washington County Public Works Deptartment at 435-301-7670 to reserve a printed set of plans and specifications and to get your name on a list for any notifications of bid addenda or clarifications.

The bid will be awarded to the lowest responsible responsive bidder. If, however, the County deems it to be in the best interest of the County, the County reserves the right to reject any and all bids, to waive any informalities or minor defects in any bids, to eliminate entire items, and increase or decrease the quantities shown in the bid form.

Visit Public Works to download Bid Documents

RFSQ for Frog Hollow Rehabilitation Project

Washington County is requesting qualifications from Engineering Firms licensed in the State of Utah for final design resulting in the rehabilitation of Frog Hollow Debris Basin located approximately five miles Southwest of Hurricane, Utah.

Four (4) copies of the SOQ are due at Washington County Public Works Office and must be received by Friday, March 22, 2019 at 5 p.m. to be eligible for consideration.

Proposals are to be submitted in a sealed envelope and marked “Engineering and construction surveillance services for the Frog Hollow Debris Basin Rehabilitation Project SOQ”.

Attention: Todd Edwards – Washington County Engineer 
Washington County Public Works 
111 East Tabernacle Street 
St. George, UT 84770
(Google Maps)

Download Proposal documents: